A robust, proven and easy-to-use management tool dedicated to the control and compliance of your facilities.
Linspec Cloud allows you to:
- To monitor your industrial equipment,
- To optimize your inspection programs,
- To implement an RBI methodology.
The benefits
- To reinforce the regulatory monitoring of your equipment,
- To save time in the constitution of the technical and regulatory documentation
- To secure your facilities
1
Regulatory inventory
Linspec Cloud adapts to all current regulations
-
Carry out the inventory of equipment according to their regulatory classification by country and their location in the plants.
Ensure regulatory compliance of your facilities
Group the equipment (pressure accessories, protective devices, components):
- Asset inventory.
- Traceability of schedules (periodic inspection or not, with inspection history).
- Management of operating ranges (lists of tasks by inspection with diagram and location of controls).
- Follow-up of control points on assets (thickness, visual, with photos).
- Location of control points
- Report of the control measures with diagram or photo and report of the intervention (configurable frame): customizable
- Traceability of conclusions and follow-up of recommendations
- Traceability of interventions and events
- Management of report editions: customization of edition frames
- Access rights management.
- Customize the description of the assets by possible type of equipment (lifting, containers, civil engineering, pipelines, nuclear power plant, tanks, air cylinders...)
2
Planning
Realize significant time savings, especially during downtime.
-
Plan deadlines with preparation of inspection reports and plans and shutdown reports
Plan your actions and compile your inspection plans
Edition of inspection plans
Linspec Cloud offers the edition of inspection plans from the data entered in the software, for containers, tanks, piping.
Linspec Cloud also allows you to manage the revisions of the inspection plans that have been established. At any given time, only one inspection plan may be in the process of being validated, as the previous one must have been validated.
In its current version, Linspec Cloud allows you to keep the history of validated inspection plans in PDF format. It will be possible for an inspector to search for a version of the inspection plan, display it and even print it. A user will only be able to edit the last version in history, the other versions can only be consulted by an inspector.
Creation of inspection schedules: Task list
Each task is numbered and a barcode reader displays the action directly in Linspec Cloud to perform the update.
3
Risk Based Inspection (RBI)
Optimize the availability of your equipment
With Linspec Cloud, set and monitor the frequency of control actions according to the evolution of the criticality of equipment.
Optimize the controls to be performed, maximize equipment availability while reducing operating costs.
Criticality-Based Inspection Methodology, also known as "CBI" or "RBI
- Inventory and analysis of corrosion loops,
- Analysis of degradation modes and identification of COCLs (thresholds to be monitored)
- Criticality study: customization possible
- Configurable by degradation mode
- Management of inspection plans (plan, actions, in relation with degradation mode and location of control points...)
4 Analytics, mobility and connectivity
The technology adapts to your needs:
- BI (Business Intelligence) dashboard.
- Mobile application (on tablet, phone).
- Interfaces with your CMMS (due date, equipment characteristics, recommendations)
Interfaces adapted to your CMMS
Our team of developers has created interfaces between maintenance applications (CMMS) and Linspec Cloud :
- Automatic creation of notices (no double entry)
- Better follow-up of inspection report findings (no oversight)
- Status of notices (quick feedback, overview, reminders, etc.)
- From then on, the maintenance department and the inspection department communicate effectively.
LINSPEC Cloud offerings
Discover Sirfull's flexible offerings that fit your business.
Linspec Cloud offers include: modules, features, integration and support.
1 site | 1000 assets
- Equipment management
See the details of the features
Features |
Starter Pack |
Premium Pack | Company Pack |
Management |
|||
Access to the materials repository |
+
|
+
|
+
|
Creation of your fluid repository |
+ | + | + |
Creation of your degradation mode repository |
+ | + | + |
Creation of your NDT repository | + | + | + |
Access and configuration of equipment templates |
+ | + | + |
Creation of custom equipment templates | - | + | + |
Parameterization and access to the regulatory engine | - | + | + |
Inventory and asset tracking (filing, export and filtering) | + | + | + |
Links with protective bodies |
+ | + | + |
Links to accessories and components | + | + | + |
Management of documents/photos related to the equipment | + | + | + |
Periodic monitoring of regulatory deadlines |
+ | + | + |
Follow-up of NDT |
+ | + | + |
History of actions taken |
+ | + | + |
Definition of ranges |
+ | + | + |
Management of documents/schematics related to ranges |
- | + | + |
Editing schedules |
+ | + | + |
Definition of control points on equipment |
+ | + | + |
Definition of inspection point characteristics |
+ | + | + |
Location of control points on diagrams |
+ | + | + |
Parameterization of the forms of seizure of the reports |
- | + | + |
Follow-up of reports |
+ | + | + |
Entry of controls (or measures) on the control points |
- | + | + |
Management of documents/photos related to the minutes |
+ | + | + |
Input of inspection findings (Recommendations) |
- | + | + |
Follow-up of interventions (notable or not) / events |
- | + | + |
Inventory of equipment recommendations |
- | - | + |
Follow-up of the progress of the equipment recommendations |
- | - | + |
Setting up the report edition frames |
- | 10 frames | Without limits |
Management and assignment of rights by user |
- | + | + |
RBI |
|||
Inventory of corrosion loops | - | + | + |
Management of corrosion loop revisions | - | + | + |
Analysis of degradation modes by corrosion loops | - | + | + |
Identification of COCLs | - | + | + |
History of COCL Exceedances | - | - | + |
Parameterization of multitask criticality studies | - | 1 native study | Multi studies |
Possibility of automatic calculation settings | - | + | + |
Parameterization of criticality matrices | - | + | + |
Management of criticality study revisions (Questionnaires) | - | + | + |
Scoring of criticality studies by equipment | - | + | + |
Scoring of criticality studies by degradation mode | - | + | + |
Management of criticality study revisions (Ratings) | - | + | + |
Creation of inspection plans | - | + | + |
Management of inspection plan revisions | - | + | + |
Implementation of NDT to monitor degradation | - | + | + |
Definition of the control points to be followed by deadline | - | + | + |
Association of the control points on the diagrams | - | + | + |
Editing of validated inspection plan revisions | - | + | + |
Planning |
|||
Preparation of the deadlines to be achieved | - | - | + |
Preparation of reports on deadlines | - | - | + |
Preparation of inspection plans, other editions | - | - | + |
Follow-up of the achievement of the deadlines | - | - | + |
Stop report (including 1 generic frame) | - | - | + |
RBI SMART | |||
Setting of frequency rules according to criticality | - | - | + |
Definition of optimized maturity calculation algorithms (API) | - | - | + |
Proposal/Optimization of inspections according to RBI settings | - | - | + |
Dashboards |
|||
Creation of dashboards and data analysis | - | 2 TDB | 5 TDB |
Mobile application |
|||
Entering inspection reports | - | on quotation | on quotation |
Visualization of equipment characteristics | - | on quotation | on quotation |
Interface
|
|||
Interfacing with CMMS or ERP | - | on quotation | on quotation |
1 site | 2000 assets
- Equipment libraries
- RBI
- Dashboards
- CMMS/ERP interface and mobile application (on request)
See the details of the features
Features |
Starter Pack |
Premium Pack | Company Pack |
Management |
|||
Access to the materials repository |
+
|
+
|
+
|
Creation of your fluid repository |
+ | + | + |
Creation of your degradation mode repository |
+ | + | + |
Creation of your NDT repository | + | + | + |
Access and configuration of equipment templates |
+ | + | + |
Creation of custom equipment templates | - | + | + |
Parameterization and access to the regulatory engine | - | + | + |
Inventory and asset tracking (filing, export and filtering) | + | + | + |
Links with protective bodies |
+ | + | + |
Links to accessories and components | + | + | + |
Management of documents/photos related to the equipment | + | + | + |
Periodic monitoring of regulatory deadlines |
+ | + | + |
Follow-up of NDT |
+ | + | + |
History of actions taken |
+ | + | + |
Definition of ranges |
+ | + | + |
Management of documents/schematics related to ranges |
- | + | + |
Editing schedules |
+ | + | + |
Definition of control points on equipment |
+ | + | + |
Definition of inspection point characteristics |
+ | + | + |
Location of control points on diagrams |
+ | + | + |
Parameterization of the forms of seizure of the reports |
- | + | + |
Follow-up of reports |
+ | + | + |
Entry of controls (or measures) on the control points |
- | + | + |
Management of documents/photos related to the minutes |
+ | + | + |
Input of inspection findings (Recommendations) |
- | + | + |
Follow-up of interventions (notable or not) / events |
- | + | + |
Inventory of equipment recommendations |
- | - | + |
Follow-up of the progress of the equipment recommendations |
- | - | + |
Setting up the report edition frames |
- | 10 frames | Without limits |
Management and assignment of rights by user |
- | + | + |
RBI |
|||
Inventory of corrosion loops | - | + | + |
Management of corrosion loop revisions | - | + | + |
Analysis of degradation modes by corrosion loops | - | + | + |
Identification of COCLs | - | + | + |
History of COCL Exceedances | - | - | + |
Parameterization of multitask criticality studies | - | 1 native study | Multi studies |
Possibility of automatic calculation settings | - | + | + |
Parameterization of criticality matrices | - | + | + |
Management of criticality study revisions (Questionnaires) | - | + | + |
Scoring of criticality studies by equipment | - | + | + |
Scoring of criticality studies by degradation mode | - | + | + |
Management of criticality study revisions (Ratings) | - | + | + |
Creation of inspection plans | - | + | + |
Management of inspection plan revisions | - | + | + |
Implementation of NDT to monitor degradation | - | + | + |
Definition of the control points to be followed by deadline | - | + | + |
Association of the control points on the diagrams | - | + | + |
Editing of validated inspection plan revisions | - | + | + |
Planning |
|||
Preparation of the deadlines to be achieved | - | - | + |
Preparation of reports on deadlines | - | - | + |
Preparation of inspection plans, other editions | - | - | + |
Follow-up of the achievement of the deadlines | - | - | + |
Stop report (including 1 generic frame) | - | - | + |
RBI SMART | |||
Setting of frequency rules according to criticality | - | - | + |
Definition of optimized maturity calculation algorithms (API) | - | - | + |
Proposal/Optimization of inspections according to RBI settings | - | - | + |
Dashboards |
|||
Creation of dashboards and data analysis | - | 2 TDB | 5 TDB |
Mobile application |
|||
Entering inspection reports | - | on quotation | on quotation |
Visualization of equipment characteristics | - | on quotation | on quotation |
Interface
|
|||
Interfacing with CMMS or ERP | - | on quotation | on quotation |
Multisite | no asset limits
- Equipment libraries
- RBI
- RBI Smart
- Planning
- Dashboards
- CMMS/ERP interface and mobile application (on request)
See the details of the features
Features |
Starter Pack |
Premium Pack | Company Pack |
Management |
|||
Access to the materials repository |
+
|
+
|
+
|
Creation of your fluid repository |
+ | + | + |
Creation of your degradation mode repository |
+ | + | + |
Creation of your NDT repository | + | + | + |
Access and configuration of equipment templates |
+ | + | + |
Creation of custom equipment templates | - | + | + |
Parameterization and access to the regulatory engine | - | + | + |
Inventory and asset tracking (filing, export and filtering) | + | + | + |
Links with protective bodies |
+ | + | + |
Links to accessories and components | + | + | + |
Management of documents/photos related to the equipment | + | + | + |
Periodic monitoring of regulatory deadlines |
+ | + | + |
Follow-up of NDT |
+ | + | + |
History of actions taken |
+ | + | + |
Definition of ranges |
+ | + | + |
Management of documents/schematics related to ranges |
- | + | + |
Editing schedules |
+ | + | + |
Definition of control points on equipment |
+ | + | + |
Definition of inspection point characteristics |
+ | + | + |
Location of control points on diagrams |
+ | + | + |
Parameterization of the forms of seizure of the reports |
- | + | + |
Follow-up of reports |
+ | + | + |
Entry of controls (or measures) on the control points |
- | + | + |
Management of documents/photos related to the minutes |
+ | + | + |
Input of inspection findings (Recommendations) |
- | + | + |
Follow-up of interventions (notable or not) / events |
- | + | + |
Inventory of equipment recommendations |
- | - | + |
Follow-up of the progress of the equipment recommendations |
- | - | + |
Setting up the report edition frames |
- | 10 frames | Without limits |
Management and assignment of rights by user |
- | + | + |
RBI |
|||
Inventory of corrosion loops | - | + | + |
Management of corrosion loop revisions | - | + | + |
Analysis of the modes of degradation by corrosion loops | - | + | + |
Identification of COCLs | - | + | + |
History of COCL Exceedances | - | - | + |
Parameterization of multitask criticality studies | - | 1 native study | Multi studies |
Possibility of automatic calculation settings | - | + | + |
Parameterization of criticality matrices | - | + | + |
Management of criticality study revisions (Questionnaires) | - | + | + |
Scoring of criticality studies by equipment | - | + | + |
Scoring of criticality studies by degradation mode | - | + | + |
Management of criticality study revisions (Ratings) | - | + | + |
Creation of inspection plans | - | + | + |
Management of inspection plan revisions | - | + | + |
Implementation of NDT to monitor degradation | - | + | + |
Definition of the control points to be followed by deadline | - | + | + |
Association of the control points on the diagrams | - | + | + |
Editing of validated inspection plan revisions | - | + | + |
Planning |
|||
Preparation of the deadlines to be achieved | - | - | + |
Preparation of reports on deadlines | - | - | + |
Preparation of inspection plans, other editions | - | - | + |
Follow-up of the achievement of the deadlines | - | - | + |
Stop report (including 1 generic frame) | - | - | + |
RBI SMART | |||
Setting of frequency rules according to criticality | - | - | + |
Definition of optimized maturity calculation algorithms (API) | - | - | + |
Proposal/Optimization of inspections according to RBI settings | - | - | + |
Dashboards |
|||
Creation of dashboards and data analysis | - | 2 TDB | 5 TDB |
Mobile application |
|||
Entering inspection reports | - | on quotation | on quotation |
Visualization of equipment characteristics | - | on quotation | on quotation |
Interface
|
|||
Interfacing with CMMS or ERP | - | on quotation | on quotation |